Exterior and Interior Views

This new building will be the first of its kind for Mercedes Benz in Malaysia as it combines both the training center and new headquarter office in one building, located just opposite from new Alam Sutera LRT station, the location and with the provision of bicycle park and shower facilities encourages the use of alternative transportation for the employees and trainees.

Sustainability Highlight:
Energy Saving - 20% compare to ASHRAE 90.1 Energy Standard
Water Saving - 45% compare to US EPA standard

Input by IEN Consultants

  • Facade optimization - high-performance glass selection.

  • ACMV optimization - High Efficient VRF Air Conditioning system to reduce the air-conditioning energy consumption and cost effective compared to chilled water system.

  • Rainwater harvesting optimization - No potable water for Irrigation.

  • Efficient lighting and appropriate lux level design with the combination of T-5 Lamp, LED high bay lamp and PLC downlight.


LEED
Gold

Year of completion: 2016
Project scale: 25,000 m2
Energy benchmark: > 20% Energy Saving
Client: Hap Seng Land Sdn Bhd
Contractor: Nakano Construction Sdn Bhd
Architect: ASIMA